Replacing windows is slowed down by many factors
Due to the continued existence of COVID-19 tempered window manufacturer labor restrictions, continued material shortages, and accelerated demand pushing the limits of supply, the market for new and replacement windows for housing is currently in a state of chaos.As the project was delayed, the builders and homeowners were very frustrated, and the costs seemed to be increasing.This is a very difficult market situation and requires a lot of patience.
As with other tempered window manufacturer issues, the main question is: "Is this true or just to increase the price?" The answer is yes-it is very real.The reputation and brand of window manufacturers have been damaged, and long-term dealer relationships have been severely damaged.No one in the window industry is happy with the current situation, and these problems have caused huge additional costs when these companies should be free-flowing commodities.
Furniture delay: Still waiting for the sofa, bed or table?It can take months to get new furniture
The COVID-19 pandemic has caused a large number of absenteeism issues and reduced production due to social distancing requirements.The pandemic has caused a significant slowdown in foreign supply lines that support the raw materials needed to build windows.In addition, after nearly a year and a half, the US housing market and commercial market are increasing pressure on all construction sectors.In the third and fourth quarters of 2021, the tsunami of construction projects is approaching.
To understand the intensity of the current tempered window manufacturer market, consider how window costs and delivery times have changed since the pandemic began in February 2020.The RoMac Construction Supply Whole House Commodity Index draws 3050 white vinyl Low-E cost every month with colonial grid insulated windows and 6068 white vinyl Low-E insulated sliding glass doors.Before the pandemic, the lead time for windows orders was 4 weeks, and sliding glass doors took 6 weeks.
Today, the current delivery time for this window is 24 weeks, and to get the sliding glass door from tempered window manufacturer, you need to wait 27 weeks.Pricing over the same period reflects the increase in demand, as the price of windows has risen by 31.6%, and the price of sliding glass doors has risen by 73.6% because manufacturers have changed specifications to narrow the product range.
Besides stopping their tempered window manufacturer projects, what else can homeowners and builders do?Delaying or stopping the project is not an option, as delays may cost more money in scope and labor.Here are some tips that can help you solve the current window shortage.
First, avoid special orders and try to use the inventory window in your project.Modifying the window opening by two inches to save 20 weeks of waiting time is a good choice.Many suppliers have increased the inventory of the basic window, and you should consider purchasing the inventory of a local distributor.
Next, homeowners and builders need to plan ahead and order windows for the project as early as possible.Please check the size, color, grid pattern and all other details carefully before ordering, because mistakes may cost extra money and time.After confirming the details, order windows immediately, even if the first shovel has not turned the dirt.
Finally, be patient.These tempered window manufacturer are overwhelmed by the problem, so it is unsuccessful to call to move your order to the front of the production line.Unfortunately, manufacturers have been dealing with angry customers all day long, and these customers are waiting on the windows causing delays on the construction site.
Due to the current long delivery times, pandemics, tempered window manufacturer supply chain breaks and the arrival of the new house tsunami, the window market hardly sees any signs of relief.Your best course of action is to plan early and be patient!